Work Method Statements
Plumbing Hot & Cold Water Rough In Safe Work Method Statement

This 7 page Safe Work Method Statement for Plumbers outlines the steps for Hot and Cold Water Rough In, the risks or hazards of each step and control measures.
The Safe Work Method Statement for Hot and Cold Water Rough In is the process used by plumbers for putting in the hot and cold water pipes to a new premises and testing them under pressure on completion.
The Safe Work Method Statement includes:
- PPE
- Operators requirements
- Transportation
- Planning
- Preparation and Site Awareness
- Pre commencement checks
- Operation
- On completion
- References
- Risk Ratings
The Safe Work Method Statement is in MSWord Format for unlimited printing and use. The Safe Work Method Statement will be emailed directly to you.

Plumbing Hot and Cold Water Rough In Additional Safety Information
When Plumbing Hot and Cold Water Rough In:
- Ensure all tools and associated equipment are restrained from movement within vehicle when transporting.
- Regularly check all safety equipment is available and in working order.
- Ensure the correct piping for the job is available.
- When cutting pipe, ensure that guards are fitted