Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Pallet Jack Safe Work Method Statement

SWP_Sample

The Safe Use of a Manual Pallet Jack Safe Work Method Statement (SWMS) is a comprehensive 4 page procedure outlining the safety steps for operating a Pallet Jack.

The Pallet Jack SWMS is a ready to use procedure and not a blank template. Simply add your company details and add any site specific details or risks. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Safe Work Method Statement includes:

  • PPE
  • Safety Notes
  • Operators Requirements
  • Activity Preparation
  • Pre Operational Checks
  • Operation
  • On Completion
  • References

 

The Safe Work Method Statement is in MSWord Format for unlimited printing and use. The Safe Work Method Statement will be emailed directly to you.

Buy Now $79.95 plus GST

Pallet Jack Additional Safety Information

When Operating A Pallet Jack: