Mitre Saw Safe Work Method Statement

The Mitre Saw or Compound Drop Saw Safe Work Method Statement is a 6 page Safe Work Method Statement covering the risks involved with using a Mitre Saw and the control measures to counter those risks.
The Safe Work Method Statement includes:
- Personal Protective Equipment (PPE)
- Safety Notes
- Operators requirements
- Transporting
- Site Awareness
- Preparation
- Operation
- On Completion
- References
- Risk Ratings
The Safe Work Method Statement is in MSWord Format for unlimited printing and use. The Safe Work Method Statement will be emailed directly to you.

Mitre Saw Additional Safety Information
Before Operating A Mitre Saw:
- Set it up in a location that is clear of others, has sufficient light, a near by source of power and comfortable room.
- Always ensure all appropriate PPE is worn
- Use the non-preferred hand to hold timber the in place.
- Never cross arms whilst using the saw.