Insulation - Batts - Safe Work Method Statement

The Installation of Batts Insulation Safe Work Method Statement is a 9 page Safety Procedure covering the steps involved in installing batt insulation into the ceilings of new and existing homes.
It covers the risks involved and control measures to counter those risks.
The Safe Work Method Statement includes:
- Personal Protective Equipment (PPE)
- Safety Notes
- Operators Requirements
- Transporting
- Planning
- Equipment checks
- Preparation and much more
- Risk Ratings
The Safe Work Method Statement is in MSWord Format for unlimited printing and use. The Safe Work Method Statement will be emailed directly to you.

Insulation (Batts) Additional Safety Information
Before Installing Roof Insulation:
- Ensure all equipment and bags of batt are secured before transporting.
- Determine/Locate any previously installed cabling, heat sources, lights etc.
- Do not work for long periods above shoulder height.
- Use a knife to cut the batts to the desired size.