Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Hairdressing Safe Work Method Statement

SWP_Sample

The Hairdressing Safe Work Method Statement is a 7 page Safety Procedure covering the steps involved in hairdressing.

It outlines the common risk and hazards encountered in hairdressing and how to counter those risks.

The Safe Work Method Statement includes:

  • Personal Protective Equipment (PPE)
  • Safety Notes
  • Planning
  • Set Up
  • Mixing Chemicals
  • Operation- Appointments, cutting/styling, storage/stock retrieval
  • Clean Up
  • Security
  • Emergency Procedures
  • References
  • Risk Ratings

 

The Safe Work Method Statement is in MSWord Format for unlimited printing and use. The Safe Work Method Statement will be emailed directly to you.

Buy Now $79.95 plus GST

Hairdressing Additional Safety Information

When Hairdressing Always:

  • Ensure there are adjustable seats, adequate lighting and trolleys provided for equipment.
  • Ensure there is PPE available and suitable for the task.
  • To use chemicals before used by date.
  • There are no tripping hazards.