Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Wide Belt Sander Work Method Statement (WMS)

The four page Work Method Statement outlines the Safety Steps required to operate a Wide Belt Sander Safely.

Wide Belt Sander's need to be used with caution and appropiate Work Method Statements implemented. The Wide Belt Sander Work Method Statement is ready to use and is not a blank template. Simply add your company, site specific and task specific details. Work Method Statements are e-mailed out as Microsoft Word documents for easy editing.

The Work Method Statement includes:

  • Risk Assessment
  • Operators Requirements
  • Site Awareness
  • Pre-Start Daily Checks
  • Completion
  • Maintenance
  • Microsoft Word Format
  • E-mailed out

 

 

Belt-Sander-Work-Method-Statement

 

Wide Belt Sander Safety Notes

Before Operating A Wide Belt Sander:

  • No one is to use the Wide Belt Sander, unless trained to do so.
  • Confirm the dust extractor is working before commencing operation.
  • Do not wear loose clothing or jewellery.
  • Inspect sanding belts before using them.
  • Sand with the grain of the wood.

Back  Buy Now $79.95 plus GST