Work Method Statements
Tig Welding Work Method Statement (WMS)
The six page Work Method Statement outlines the Safety Steps required to Safely operate a Tig Welder.
Tig Welding needs to be used with caution and appropiate safety procedures implemented. The Tig Welding Procedure is e-mailed to you in Microsoft Word format for easy editing. Simply add your company details, site specific and task specific details. It is then ready to be used as part of your overall OHS System, for staff Induction Training, Tool Box talks or company tenders.
The Work Method Statement includes:
- Operators Requirements
- Transporting
- Planning
- Preparation & Site Awareness
- Pre-Commencement Checks
- Operation
- On Completion


Tig Welding Safety Notes
When Operating a Tig Welder:
- All employees involved in the welding activities should be qualified Boilermakers/tradesmen and experienced trade assistants and labourers.
- Ensure cylinder is positioned vertically, restrained and protected from impact when transporting.
- Ensure MSDS is conveniently located during transit.
- Ensure that a trained first aid officer is always within the team involved in welding activities.