Work Method Statements
Waterproofing Wet Areas Safe Work Method Statement

The seven page Safe Work Method Statement outlines the Safety Steps required to Safely Waterproof Wet Areas..
Waterproofing needs to be used with caution and appropiate safety procedures. The Water Proofing Wet Areas procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
The Safe Work Method Statement includes:
- Personal Qualifications and Experience
- Material Safety Data Sheets
- Planning
- Site Awareness
- Preparation
- Pre-Start Checks
- Implementing
- Completion

Waterproofing Wet Areas Safety Notes
Before Waterproofing Wet Areas:
- Ensure all walls will be water resistant and all penetrations will be waterproofed.
- All cuts and penetrations should be sealed.
- All surfaces must be structurally sound, clean and dry. Also they must be free of voids, curing compounds, projections, loose materials, oils, grease etc.
- Check that waterproof mortars and grouts have been identified, selected, prepared and mixed to specifications.