Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Locating Sub-Soil Cabling (Non Evasive) Safe Work Method Statement

SWP_Sample

dLocating Sub Soil Cabling or underground cabls requires a suitable Safe Work Method Statement for employees and contractors to follow when locating cables. Without a proper process, electrical cables and utility services can be disrupted accidently.

This four page Safe Work Method Statement has been developed for employers to be able to give direct instructions on how to locate underground cables safely. The document can be used as part of a Safety Induction or simply implemented into an existing OHS System.



The Safe Work Method Statement for Locating Underground Cabling includes:

  • Site Risks
  • Employee/Contractor Requirements
  • Planning
  • Signage
  • Hazards, Pits & Man Holes etc..
  • Performing the Task
  • Completion

The Safe Work Method Statement is in MSWord Format and is email ready. It is generally emailed within six business hours.

Referenced from:

  • Victoria - Road Management Act 2004 - Worksite Safety – Traffic Management - Code of Practice
  • Queensland – Manual of Uniform Traffic Control Devices – Part 3
  • Queensland – Information paper - Sun Safety and Heat Stress.
  • Australian Standard – AS1742.3 Traffic Control Devices for Works on Roads
Buy Now $99.95 plus GST