Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Thicknesser Safe Work Procedure or Work Method Statement

The five page Safe Work Method Statement outlines the Safety Steps required to operate a Thicknesser Safely.

Thicknessers need to be used with caution and appropiate safety procedures. The Thicknesser procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.


The Procedure includes:

  • Risk Assessment
  • Operators Requirements
  • Saftey Awareness
  • Replacing Cutting Blades
  • Operation
  • On Completion
  • Emergency Procedures

 

SWMS Sample

Back  Buy Now $79.95 plus GST

Thicknesser Safety Notes

Before Operating A Thicknesser:

  • Do not wear loose clothing or jewellery.
  • Clean out all chips, dust, pitch or foreign matter adhering to the drum or blades before installing the blades.
  • Ensure the dust extractor heads are firmly connected to the thicknesser to avoid rattles. 
  • In an emergency quickly make the immediate work area safe by turning off any running plant and equipment, if safe to do so.
Back  Buy Now $79.95 plus GST