Work Method Statements
Stone Cladding Safe Work Procedure or Work Method Statement
The Installation of Stone Cladding Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Operation
- Emergency Procedures
- References.
- 5 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
- E-mailed out
Preparation
Ensure workers have access to:
- first aid kit/supplies
- communication devices (check mobile
phones will have service in area) - MSDS
- Drinking water, clean-up and toilet facilities
- PPE required
Inspect all equipment. Ensure:
- power tools are in good condition and power
cords are not damaged or have exposed
wires - electric leads/extension cords are not
placed in areas where they could be
damaged, run-over or pose a tripping hazard - RCD/safety switches are provided for
electrical equipment. - Guards in place
