Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Spindle Moulder Safe Work Procedure or Work Method Statement

The four page Safe Work Method Statement outlines the Safety Steps required to operate a Spindle Moulder Safely.

Spindle Moulders need to be used with caution and appropiate safety procedures. The Spindle Moulder procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.


The Procedure includes:

  • Risk Assessment
  • Operators Requirements
  • Site Awareness
  • Preparation
  • Pre-Start Daily Checks
  • Operation
  • On Completion
  • General Maintenance

 

SWMS Sample

Back  Buy Now $79.95 plus GST

Spindle Moulder Safety Notes

Before Operating A Spindle Moulder:

  • Ensure the dust extractor is operating before using machine.
  • Do not wear loose clothing or jewellery.
  • Do not distract or startle operator while he or she is using equipment.
  • Balance cutters to prevent vibration.
  • Keep the machine and the floor of the workplace clean and clear of chips, dust and workpieces.
  • Keep hands out of the line of cutter.
Back  Buy Now $79.95 plus GST