Site Maintenance Trucks Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

The Site Maintenance Trucks Safe Work Method Statement (SWMS) is a comprehensive 12 page procedure.

It outlines the safety steps for the duties associated with site maintenance of trucks for earthmoving equipment.

Duties include Fuelling, Tyre Pressure Maintenance, Attachment Transport and Greasing (with compressor driven air greaser).

The Site Maintenance Truck Procedure is ready to use and is not a blank template.

Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Site Maintenance Truck Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Set-up
  • Operation
  • Emergency Procedures

Product Details:

  • 12 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific
  • Instant download delivery

Timber Framing Site Safety

Assess site for safe access of equipment and materials delivery. Ensure:

  • Ground is firm, stable and within acceptable gradient for equipment
  • No overhead powerlines
  • Not parked between work and vehicle pathways (provide suitable traffic management as required)

Erecting Timber Frames (Timber Framing)

  • When setting out and nailing level ceiling joists, use scaffold or ladders from floor below
  • Do not walk external top plate
  • When fixing end studs to wall frame, face edge of floor while keeping centre of gravity within frame
  • Fit guard rails to window and door openings prior to raising frames
  • Prepare all braces and fixings prior to raising frame
  • Stand behind frame when raising (provide edge protection when raising frames 3.8m or above)
  • Place roof trusses onto wall top plates by crane wherever possible
  • Do not stand on top plate to receive roof trusses from below.
  • When erecting trusses from internal wall or top plate, ensure no persons enter no go zone (1.5m from edge)
  • , planks are adequately supported across span, no unguarded voids.
  • Use appropriate scaffold to locate and fix trusses from perimeter.
  • When working from raised platform/ladder near windows/voids, ensure fall protection is placed high enough to prevent fall
  • Place roof trusses and batten no more than 900mm centres
  • Do not overreach when fixing battens. Place body over roof truss