Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Sewing Machine (Industrial) Safe Work Procedure or Work Method Statement

The five page Safe Work Method Statement outlines the Safety Steps required to operate a Industrial Sewing Machine Safely.

Indstrial Sewing Machines need to be used with caution and appropiate safety procedures. The Industrial Sewing Machine procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.


The Procedure includes:

  • Pre-Start Daily Checks
  • Needle Replacement
  • Preparation
  • Operation
  • Close Down
  • General Maintenance

 

SWMS Sample

Back  Buy Now $79.95 plus GST

Industrial Sewing Machine Safety Notes

Before Operating an Industrial Sewing Machine:

  • Apply just one drop of oil to each of the designated holes using the supplied oil can daily.
  • Over-oiling the sewing machine will encourage grime buildup and can lead to premature part failure.
  • Pull the bobbin thread through the needle hole in the needle plate before starting to stitch.
  • Never sew with the presser foot in a raised position.
  • Hold the fabric firmly between your fingers and allow the feed dogs to pull the fabric.
Back  Buy Now $79.95 plus GST