Work Method Statements
Rock Saw (Wheel) Excavator Use Safe Work Method Statement

The seven page Safe Work Method Statement outlines the Safety Steps required to operate a Rock Saw Safely.
Rock Saw's need to be used with caution and appropiate Safe Work Method Statements. The Rock Saw Safe Work Method Statement is ready to use and is not a blank template. Safe Work Method Statements can be edited or customised in MS Word if required.
The Safe Work Method Statement includes:
- Personal Qualifications and Experience
- Transporting
- Planning
- Site Awareness
- Preparation
- Pre-Start Checks
- Operation
- On Completion
Rock Saw Safety Notes
Before Operating A Rock Saw:
- To prevent damage to the saw it must always be transported inside its storage frame.
- The saw blade while cutting rock can expel debris for several metres.
- Ensure all personnel are aware of the safety zone to be maintained around the saw while in operation.
- The saw may be supplied with two mounting positions, one for extended reach.
References: |
|
|
Australia – NTIS – National Training Information Service - BCCPO3003B: Conduct excavator operations. United States - NIOSH (National Institute for Occupational Safety and Health) Publication No. 2004-107: Preventing Injuries When Working with Hydraulic Excavators and Backhoe Loaders. Hong Kong – Labour Department - Code of Practice in the Safe Use of Excavators. Hydrapower - Operation Manual for Profilers. |
