Work Method Statements
Postformer

Product Details:
- 7 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
- E-mailed out
Product Information:
The Postformer Safe Work Method Statement (SWMS) is a comprehensive 7 page procedure outlining the safety steps for the operation of a Postformer.
The Postformer procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Postformer procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
Completion and Maintenance:Ensure power is isolated from post former when complete and before undertaking any maintenance/repair work. If not practicable, use inching function.
Clear trimmed chips from machine. Use industrial vacuum to clean up dust/waste materials.
Ensure:
- Guards are undamaged and functional
- Manufacturers instructions for servicing
Product Details:
- 7 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
- E-mailed out
Note:
If local exhaust system installed, ensure this is cleaned at least annually (depending on level of use).
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Pre-operational Inspection
- Operation
- Completion
- Maintenance
- Emergency Procedures & First Aid
For larger fire outbreaks – call 000
References:- OHS Legislation in all States
- National Standard for Plant [NOHSC:1010(1994)]
- Queensland Code of Practice for Plant
- St. Johns Ambulance – First Aid Advice
- AS 1473 – 1991. Guarding and Safe Use of Woodworking Machinery
- Evans Model 6000, 2008. Post Former, Installation and Operations Manual
The Safe Work Method Statement is in MSWord Format for unlimited printing and use. The Safe Work Method Statement will be emailed directly to you.