Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Post hole Digger Safe Work Procedure or Work Method Statement

The six page Safe Work Method Statement outlines the Safety Steps required to operate a Post Hole Digger Safely.

Post Hole Diggers need to be used with caution and appropiate safety procedures. The Post Hole Digger procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.


The Procedure includes:

  • Risk Assessment
  • Pre-Start Checks
  • Safely Parking
  • Attatching Hydraulic Hoses
  • Travelling To Job Site
  • Aligning The Digger
  • Operation
  • Inspection

 

SWMS Sample

Back  Buy Now $79.95 plus GST

Post Hole Digger Safety Notes

Before Operating A Post Hole Digger:

  • Check the hydraulic hose and repair or replace if necessary.
  • Reverse the tractor and safely park near the digger/knocker.
  • Connect the PTO, Digger and Hoses to the tractor.
  • Always keep a safe distance between the moving tractor and the 2nd operator.
  • Clean the hole and auger, with the auger being raised while rotating.
Back  Buy Now $79.95 plus GST