Work Method Statements
Plasterboard Fixing Work Method Statement
This seven page Safe Work Method Statement outlines the steps required to safely fix Plasterboard to the walls.
Plasterboard Fixing needs to be used with caution and appropiate safety procedures.
The Plasterboard Fixing procedure is This Is Not A Blank Template and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
The Safety Procedure includes:
- Personal Qualifications and Experience
- Site Awareness
- Preparation
- Pre-Start Daily Checks
- Application
- Completion of Work
- Risk Ratings
Product Details:
- 7 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
- Instant download delivery
Plasterboard Fixing Safety Notes
When Fixing a Plasterboard:
- Ensure all employees have been trained/instructed on how to complete the operation.
- Ensure that all plasterboard and materials are delivered and positioned to minimise manual handling / clutter.
- Have plasterboard lifted (by crane) when working above ground level. Crane crew to adhere to Safe Work Procedure applicable to the lift
- Ensure all fixings are in good condition
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.