Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Pipe Bender Safe Work Procedure or Work Method Statement

The four page Safe Work Method Statement outlines the Safety Steps required to operate a Pipe Bender Safely.

Pipe Bender's need to be used with caution and appropiate safety procedures. The Pipe Bender procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.


The Procedure includes:

  • PCP
  • Risk Assessment
  • Pre-start Checks
  • Commence Pipe Bending Operation
  • Completion

 

SWMS Sample

Back  Buy Now $79.95 plus GST

Pipe Bending Safety Notes

When Operating A Pipe Bender:

  • Clear the work area of all unwanted and unnecessary metal pieces.
  • Lock off the hydraulic bleeder.
  • Keep both hands well clear of the area between the die and rollers.
  • To remove the pipe, release the hydraulic pressure.
  • Remove the handle from the machine and store properly.
Back  Buy Now $79.95 plus GST