Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Pedestal Drill Safe Work Procedure or Work Method Statement

The four page Safe Work Method Statement outlines the Safety Steps required to operate a Pedestal Drill Safely.

Pedestal Drill's need to be used with caution and appropiate safety procedures. The Pedestal Drill procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.


The Procedure includes:

  • Risk Assessment
  • Inspect Work Area
  • Select Drill Speed
  • Fit Drill Bit
  • Secure Work
  • Drilling
  • Switch Off Machine

 

SWMS Sample

Back  Buy Now $79.95 plus GST

Pedestal Drill Safety Notes

Before Operating A Pedestal Drill:

  • Do not use the equipment if there is any fault.s
  • Lift the pully cover and adjust V belts to the required speeds.
  • Select a sharp drill bit and the required size.
  • Place the item to be drilled in the vice and secure.
  • User a brush to remove metal chips when finished.
Back  Buy Now $79.95 plus GST