Work Method Statements
Mobile Crane Safe Work Method Statement

The nine page Safe Work Method Statement outlines the Safety Steps required to Safely Operate a Mobile Crane.
Mobile Crane Operation needs to be used with caution and appropiate Safe Work Method Statements. The Mobile Crane Operation Safe Work Method Statement is ready to use and is not a blank template. Safe Work Method Statement can be edited or customised in MS Word if required.
The Safe Work Method Statement includes:
- Operators Requirements
- Major Injury Risks
- Planning
- Site Awareness
- Electrical Safety
- Preparation
- Pre-Operational Inspection
- Lifting Gear Checks
- Crane Setup
- Access
- Conduct A Trial Lift
- Operation
- Travelling On Site
- General Maintenance


Mobile Crane Operation Safety Notes
When Operating a Mobile Crane:
- Correct training should include: Legislative Requirements, Safe Work Method Statements, Fitting Of Personal Protective Equipment, and Manual Handling
- Check for any previous unintended crane stoppages, or faults found with the crane using the log book.
- A load chart must be available for the crane in use and for the loads being lifted.
- Always inspect boom hoist lockout and other operator aids.