Work Method Statements
Metal Turning Lathe Safe Work Procedure or Work Method Statement
The five page Safe Work Method Statement outlines the Safety Steps required to operate a Metal Turning Lathe Safely.
Metal Turning Lathes need to be used with caution and appropiate safety procedures. The Metal Turning Lathe procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
The Procedure includes:
- Preperation
- Pre-start Checks
- Set-Up Machine
- Commence Operation
- Close Down Machine
- Clean Up


Metal Turning Lathe Safety Notes
Before Operating A Metal Turning Lathe:
- Always keep work area clear of any obstacles on the floor.
- Set the tool bar assembly to the correct height.
- Switch on the machine.
- Position the coolant nozzle over the work.
- Ensure tool bar has sufficient clearance away from the spinning chuck.