Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Loading Docks Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

The Loading Docks Safe Work Method Statement (SWMS) is a comprehensive 5 page procedure outlining general considerations for Loading Docks.

The Loading Docks procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Loading Docks procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Inspection
  • Operation
  • Emergency Procedures
  • References

Product Details:

  • 5 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific
  • Instant download delivery

Planning

Develop written safety instructions/rules for use of loading bays. Include:

  • Loading dock rules
  • Instructions for drivers
  • Types of equipment in use
  • Acceptable practices and types of vehicles
  • No pedestrian policy
  • Emergency procedures
  • Other items as required

Ensure all persons (including operators, drivers and the companies that drivers work for) are provided with these instructions , and an adequate induction before using loading docks.

Back   Buy Now $79.95 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.