Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Linisher – Belt and Disc Sander Safe Work Method Statement

SWP_Sample

The four page Safe Work Method Statement outlines the Safety Steps required to operate a Linisher – Belt and Disc Sander Safely.

Linisher's need to be used with caution and appropiate Safe Work Method Statements. The Linisher – Belt and Disc Sander Safe Work Method Statement is ready to use and is not a blank template. Safe Work Method Statements can be edited or customised in MS Word if required.


The Safe Work Method Statement includes:

  • Personal Qualifications and Experience
  • Site Awareness
  • Pre-Start Checks
  • Operation
  • On Completion
  • General Maintenance

 

Buy Now $79.95 plus GST

Linisher Safety Notes

Before Operating A Linisher:

  • Ensure the area around linisher is clear of obstructions and the floor is free from dust.
  • All guards must be in-place. Linisher face guards must be clean and in place.
  • The Linisher should be firmly bolted to the ground. (This ensures that the linisher will not topple over and should reduce the noise level.)
  • Locate and ensure you are familiar with the operation of the ON/OFF starter and the E-Stop.

Buy Now $79.95 plus GST