Work Method Statements
Zoonoses – Leptospirosis (Indirect Exposure) Safe Work Method Statement

![]() |
|
| ($79.95 plus GST) | |
The SafetyProcedure includes:
- Personnel Requirements
- Planning
- Working
- Decontamination
- Symptons
General Zoonoses – Leptospirosis (Indirect Exposure) Safety Information:
Leptospirosis needs to be handled with caution and appropriate safety procedures.
The Zoonoses – Leptospirosis (Indirect Exposure) procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
