Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Guillotine Use Safe Work Procedure or Work Method Statement

The four page Safe Work Method Statement outlines the Safety Steps required to operate a Guillotine Bike Safely.

Guillotine's need to be used with caution and appropiate safety procedures. The Guillotine Use procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.


The Procedure includes:

  • Risk Assessment
  • Clear Machine and Work Surfaces
  • Start Motor
  • Position Work To Be Cut
  • Activate Guillotine
  • Switch Off Motor
  • Remove Cut Material

 

SWMS Sample

Back  Buy Now $79.95 plus GST

Guillotine Use Safety Notes

When Operating A Guillotine:

  • Clean off any scrap material from previous job.
  • Ensure cutting blade is clear.
  • Use a movable bench for large sheets of material.
  • Ensure nobody is near movable clamping guard.
  • Wait until cut is complete and lift foot or press up button .
Back  Buy Now $79.95 plus GST