Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

General Cleaning - Offices Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

The Cleaning Offices Safe Work Method Statement (SWMS) is a comprehensive 11 page procedure outlining the safety steps for general cleaning in office buildings.

The Cleaning Offices procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Cleaning Offices Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational inspection
  • Operation
  • Maintenance
  • Emergency Procedures

Product Details:

  • 11 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific
  • Instant download delivery

Emergency procedures - Chemicals

Inhalation:

  • Remove person into a well ventilated area
  • Remove any contaminated clothing

Skin contact:

  • Wash with large volume of water
  • If blistering, redness or irritation occurs – seek medical attention

Eye Contact:

  • Flush eye with water for at least 15 minutes

Ingestion:

  • Do not induce vomiting
  • Provide water and seek medical attention

Check MSDS for specific instruction and take MSDS with the patient to the Doctor.

  • Anchor points (suitable work load and position)

Develop and implement an emergency response plan for the site. Include:

  • Assembly points
  • Communication
  • Responsible persons
  • Emergency contacts (including nearest medical facility)
  • First aid training and equipment

Back   Buy Now $79.95 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.