Work Method Statements
Dust Extractor Safe Work Procedure or Work Method Statement
The four page Safe Work Method Statement outlines the Safety Steps required to operate a Dust Extractor Safely.
Dust Extractors need to be used with caution and appropiate safety procedures. The Dust Extractor procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
The Procedure includes:
- Risk Assessment
- Operators Requirements
- Site Awareness
- Operation
- Emergency Procedures


Dust Extractor Safety Notes
Before Operating A Dust Extractor:
- No person shall service the dust extractor, unless trained to do so.
- Some dry timbers can self-ignite.
- Have a Class A fire extinguisher on standby.
- Do not eat, drink or smoke around the
- Lock-Off the extraction equipment.
- If conditions are unsafe, evacuate to atleast 50 meters.