Work Method Statements
Drill Press Safe Work Procedure or Work Method Statement
The five page Safe Work Method Statement outlines the Safety Steps required to operate a Drill Press Safely.
Drill Presses need to be used with caution and appropiate safety procedures. The Drill Press procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
The Procedure includes:
- Risk Assessment
- Operators Requirements
- Inspecting The Area
- Pre-Start Checks
- Selecting Drill Speed
- Securing Work
- Drilling
- Switching Machine Off
- General Maintenance


Drill Press Safety Notes
Before Operating A Drill Press:
- No person is to use the drill press, unless trained to do so.
- Ensure the work area is clear.
- Do not use the equipment if there is any faults.
- Check that all guards are in place.
- Inspect drill bit for notches, cracks or bends and replace if necessary.
- Always place the item being drilled in a vice and tighten.