Work Method Statements
Docking Saw Safe Work Procedure or Work Method Statement
The four page Safe Work Method Statement outlines the Safety Steps required to operate a Docking Saw Safely.
Docking Saw's need to be used with caution and appropiate safety procedures. The Docking Saw procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
The Procedure includes:
- Operators Requirements
- Site-Awareness
- Pre Start Daily Checks
- Operation
- Close DOwn
- General Maitenance


Docking Saw Safety Notes
Before Operating A Docking Saw:
- Always use adequate eye and hearing protection.
- Confirm there are no open flames around the Auger.
- Make sure the area is clear.
- Keep the Auger head sharp and clean.
- Tie back long hair.