Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Curbisde Rubbish Removal Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

The Curbside Rubbish Removal Safe Work Method Statement (SWMS) is a comprehensive 7 page procedure.

This SWMS covers curbside collection of residential hard waste. It does not cover the collection of construction waste, biological or hazardous waste. This SWMS does not cover trucks fitted with a compactor.

The Curbside Rubbish Removal Work Method Statement is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Curbside Rubbish Removal procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Travel to collection site
  • Collection of curbside rubbish
  • Unloading
  • Clean up & Maintenance
  • Emergency Procedures
  • References

Product Details:

  • 7 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific
  • Instant download delivery

Unloading

Follow traffic management at landfill site.

Park in designated area. Ensure ground is flat/solid.

  • Do not stand near edge of tray or on truck body
  • Do not unload in high winds
  • Ensure adequate space above and behind vehicle for tailgate operation or truck body lift.
  • Clear persons from area.
  • For hand unloading – check load is stable, decide appropriate unloading sequence, use lifting equipment/aids, team-lifting and work from ground wherever possible.

Back   Buy Now $79.95 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.