Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Cleaning Without Adequate Ventilation Work Method Statement


First Aid/Emergency Response

Chemicals

Inhalation:

  • Remove person into a well ventilated area
  • Remove any contaminated clothing

Skin contact:

  • Wash with large volume of water
  • If blistering, redness or irritation occurs – seek medical attention

Eye Contact:

  • Flush eye with water for at least 15 minutes

Ingestion:

  • Do not induce vomiting
  • Provide water and seek medical attention

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Operation
  • First Aid/Emergency Procedures
  • References
  • 8 page procedure
  • Microsoft Word Format
  • Make it task specific
  • E-mailed out


  • Cleaning Without Adequate Ventilation Information:

    The Cleaning in cramped areas without adequate ventilation Safe Work Method Statement (SWMS) is a comprehensive 8 page procedure.

    This SWMS is intended for cleaners working in cramped work areas where ventilation is limited. This does NOT include cleaning in “Confined Spaces” as defined in relevant OHS legislation. For cleaning in Confined Spaces, a Confined Space SWMS must be used in conjunction with a Confined
    Space Entry Permit system.

    The Cleaning without adequate ventilation
    procedure is ready to use
    and is not a blank template.
    Simply add your company
    details, ABN, and include
    any site specific details or
    risks and make it specific to
    the task at hand. It is then
    ready for printing and to be
    incorporated as part of your
    overall OHS System.

    The Cleaning without adequate
    ventilation procedure can be used
    as part of your OHS inductions, for
    Tool box talks or tender applications.