Work Method Statements
Chemical Loading On Vehicle Work Procedure or Work Method Statement
The three page Safe Work Method Statement outlines the Safety Steps required to Load Chemicals Onto A Vehicle Safely.
Loading Chemicals onto a Vehicle needs to be approached with caution and appropiate safety procedures. The Chemical Loading On Vehicle procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
The Procedure includes:
- Identifying The Chemicals
- Safely Park Vehicle
- Condition Of Drums
- Drum Size Required
- Secure Load
- Spills

Loading Chemicals Onto a Vehicle Safety Notes
Before Loading Chemicals Onto A Vehicle:
- Read material safety data sheets.
- Position vehicle on even ground.
- Check for splits in drums.
- Always use a forklift for 205 litre drums or pallet loads.
- Contain spills.