Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Brick Saw Safe Work Method Statement

The six page Safe Work Method Statement outlines the Safety Steps required to Safely operate a Brick Saw.

Brick Sawing needs to be used with caution and appropiate safe work methods. The Brick Saw procedure is ready to use and is not a blank template. Safe Work Method Statements can be edited or customised in MS Word if required.


The Safe Work Method Statement includes:

  • Operators Requirements
  • Transporting
  • Planning
  • Preparation & Site Awareness
  • Pre-Commencement Checks
  • Operation
  • On Completion

 

Weed_Spray

$79.95 plus GST

Brick Saw Safety Notes

When Using a Brick Saw:

  • All employees involved within landscaping and paving activities should be qualified tradesmen and / or experienced labourers.
  • When transporting ensure the Brick saw is positioned in the vehicle to avoid damage.
  • Ensure that a trained first aid officer is always within the team involved in landscaping activities.
$79.95 plus GST