Work Method Statements
Brake Press Safe Work Procedure or Work Method Statement
The seven page Safe Work Method Statement outlines the Safety Steps required to operate a Brake Press Safely.
Brake Presses need to be used with caution and appropiate safety procedures. The Brake Press procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
The Procedure includes:
- Operators Requirements
- New Operator Induction
- Site Awareness
- Pre-Start Checks
- Preparation
- Operation
- On Completion
- General Maintenance


Brake Press Safety Notes
Before Operating A Brake Press:
- Check all guards to insure they are operating and in place.
- Check emergency stop switches are working.
- Ensure heavy items are supported.
- Ensure foot pedal is placed out of the way of material to be bent.
- Keep hands well clear of blade area.