Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Borehole Drilling Samples

SWP_Sample

Product Details:

  • 13 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific
  • E-mailed out

The Borehole- Drilling Samples Safe Work Method Statement (SWMS) is a comprehensive 13 page procedure outlining the steps for safely drilling samples.

This SWMS covers general safety issues with borehole drilling and sample drilling using a drill rig/auger mounted to vehicle.

The Borehole- Drilling Samples procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Borehole- Drilling Samples Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

Includes:

  • assembly points
  • communication
  • responsible persons
  • emergency contacts (including nearest medical facility)
  • fire fighting plans

For larger fire outbreaks – call 000

References:
  • OHS Legislation in all States
  • Safety health Alert – WorkSafe WA – Post Hole Digger
  • Guidance Doc – WorkSafe Victoria – Tractor Driven Post Hole Diggers – Entanglement
  • Hawkline Owners Manual – Mounted Post Hole Digger.
  • WorkSafe Victoria (2007) Planning for Safer Plant Operations
  • AS4839:2001 The safe use of portable mobile oxy-fuel gas systems for welding, cutting, heating and allied processes.
  • NT WorkSafe (2008) Hot Work Permit Checklist Sample
  • OHS Acts and accompanying Regulations in all States
  • Australian Standard 2550.5 – 2002 Cranes, hoists and winches—Safe use Part 5: Mobile cranes
  • ASCC (pre – NOSCH) National Certification Requirements/Technical Standard

 

The Safe Work Method Statement is in MSWord Format for unlimited printing and use. The Safe Work Method Statement will be emailed directly to you.

Buy Now $79.95 plus GST