Work Method Statements
Working Outdoors - Prevention and Treatment of Bites/Stings Safe Work Method Statement

![]() |
|
The SafetyProcedure includes:
- Operators Requirements
- Planning
- Snake Bite Prevention
- Snake Bite Treatment
- Wasp/Bee Stings Prevention
- Wasp/Bee Stings Treatment
- Mosquito/Tick Bites Prevention
- Mosquito/Tick Bites Treatment
- General Outdoor Hazards
General Bite And Sting Safety Information:
Bites and Stings need to be handled with caution and appropriate safety procedures.
The Prevention and Treatment of Bites/Stings procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.
