Work Method Statements
Antenna and Satellite Installation Work Method Statement
The Antenna & Satellite Installation Safe Work Method Statement (SWMS) is a comprehensive 9 page procedure outlining the safety steps for Antenna & Satellite Installation. This Work Method Statement covers risks associated with general installation of antenna and satellites. Ensure the manufacturer’s installation manual/guide is available for specific information on all installation works.
The Antenna & Satellite Installation procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Antenna & Satellite Installation procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Pre-operational Inspection
- Installation
- Emergency Procedures
- References
Product Details:
- 9 Page procedure
- Written by ex Whs inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for company details and project details
- Employee sign off section
- Instant download delivery
Planning
Assess installation site. Check:
- Anchor points (suitable work load and position)
- Proximity to powerlines
- Type of roof (pitched, tile, sky lights etc)
- Condition of roof (fragile, brittle etc)
- Presence of hazardous materials such as asbestos, lead, silica etc)
- Load bearing capacity of support walls, ceiling, roof
- Height of work area
- Access for equipment and materials
- Number of persons expected on roof/ceiling space
- Power supply
- Location of existing services (heating, water, pipes, electrical leads)
- Traffic Management requirements
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.