Work Method Statements
Work Method Statement Format
Work Method Statements need to be written to a format. Having a consistent layout and structure to the statement allows employees to access information quickly and in an order. The basic layout for a Work Method Statement is listed below:
- Personal Protective Equipment
- Safety Notes
- Risk Assessment
- Planning
- Preparation
- Pre-start checks
- Operation
- Completion
- Maintenance
Work Method Statement Complete List
- 3R Laser on Construction Site
- Air Compressor (Portable)
- Air Compressor (Trailer Mounted)
- Air Con Installation
- Air Con Maintenance
- Airless Spray Gun
- Aluminium Handrail Installation
- Antenna and Satellite Installation
- Armed Hold Up or Money Handling
- Asbestos Removal - Friable
- Asbestos Removal - Non Friable
- Asbestos Safety - Working in Roofs
- Audio Visual Equipment Installation
- Auger
- Backhoe or Front End Loader
- Band Saw
- Bark Blower
- Battery Charging - Lead Acid
- Bench Grinder
- BetaGuard Mobile Tower Scaffolding
- Bites and Stings (Preventing and Treating)
- Block Splitter
- Boating Safety
- Bob Cat & Skid Steer Operation
- Boiler Maintenance - in service
- Boom Lift
- Borehole Drilling Samples
- Brake Press
- Brick Laying
- Brick Saw
- Brush Cutter
- Building Maintenance - general
- Building Site Final Clean Up
- Cabinet Installation
- Carpentry Fit-off
- Carpet Cleaning
- Carpet Laying
- Carpet Tiles
- Ceiling Installation - Suspended Grid System
- Cement Mixer Usage
- Cement Rendering
- Chain Trencher
- Chainsaw Operation
- Chemical Loading On Vehicle
- Cherry Picker
- Circular Saw (Hand Held)
- Cleaning - general
- Cleaning Offices
- Cleaning Stainless Steel Welds
- Cleaning without adequate ventilation
- Concrete Batching Machine
- Concrete Construction activities at a Petrol Station
- Concrete Crusher
- Concrete Formwork
- Concrete Grinding & Polishing for Floors - (2 part Epoxy)
- Concrete Grinding and Polishing
- Concrete Helicopter
- Concrete Joining Sealing and Curing
- Concrete Line Pumping
- Concrete Preparation & Laying
- Concrete Pumping
- Concrete Sawing
- Concrete Vibrator
- Confined Space Rescue
- Confined Spaces
- Construction Site Inspection
- Contact with Utilities
- Core Drilling
- Curbside Rubbish Removal
- Cut-Off Metal Saw
- Demolition Work for Construction Sites
- Docking Saw
- Dozer Operations
- Drill Press
- Drivers Manual
- Drott (Track Loader)
- Dust Extractor
- Earth Moving Equipment Maintenance
- Earthquake Clean-up-(post)
- Earthworks - in close proximity to Power Lines and Roadways
- Edge Bander
- Electrical Fit-off
- Electrical Wiring
- Electricity - Working Around
- Enviro Wash - (Mobile)
- Epoxy Grout Application
- Excavator - Auger Attachment
- Excavator - Large
- Excavator - Mini
- Excavator Attachment - Forest Mulcher
- Excavator Attachment - Hydraulic Rock Hammer
- Excavator Attachment - Tree Shear
- Explosive Power Tool (Fastening)
- Fencing
- Fire Door Installation
- Flood Clean Up
- Forklift - LPG
- Forklift Maintenance
- Forklift Petrol/Diesel
- Forklift Truck - Electric (Non pedestrian)
- Front End Loader
- Front End Loader - Fertilizer Spreader Attachment
- Fuel Storage, Handling and Decanting
- Gang Mower
- Gantry Crane
- Garage Door Installation
- Gas Installation
- Glass Cutting on site
- Glass Handling
- Graffiti Removal
- Grinder
- Guillotine Use
- Hairdressing
- Hand Tools
- Heat Stress
- Hedge Trimmer
- Heights (Safe Working At)
- Helicopters - Working Around
- Hiab Crane or Truck Loading Crane
- Hitching Mobile Plant
- Hot Works
- Hydraulic Press
- Hydro Evacuation Truck
- Hygiene Services
- Incident Report Form
- Industrial Rope Access
- Infectious Waste - Handling and Disposal
- Installation of Screen Windows and Doors
- Insulation (Batts)
- Insulation (Blow In)
- Jackhammer - Pneumatic
- Jackhammer- petrol
- Jackhammer-Electric
- Jig Saw
- Job Safety Analysis Template
- Kitchen Strip Out and Replacement
- Knives -safe use
- LOTO - Lock Out Tag Out
- LPG (Liquid Propane Gas)
- Ladder Safety
- Landscape Fire Control
- Landscaping & Turf Laying
- Lawn Edger
- Lawn Mower - Walk Behind
- Leaf Blower
- Leptospirosis (Indirect Exposure)
- Line Marking
- Linisher
- Litter Master Industrial Vacuum
- Loading Docks
- Manual Handling (Lifting)
- Meat Slicer
- Metal Door Frames - Installation & Modification
- Metal Turning Lathe
- Mitre Saw
- Mobile Crane Operation
- Mower - Ride On (Mid Mounted Cutting Deck)
- Nail Gun - Pneumatic
- Noise Control
- Overhead Crane
- Painting (General Requirements)
- Painting Enviro Wash System
- Pallet Jack
- Panel Saw
- Paving
- Pedestal Drill
- Permit to Work - General Contractor
- Pest Control- Termites & Ants
- Photography Booth - Mobile
- Pipe Bender
- Pipe Laying (Coiled Pipe)
- Plant Roll Over
- Plasma Cutter
- Plasterboard Fixing
- Plasterboard Setting
- Plastering Stilts
- Plumbing Fit-off
- Plumbing Hot & Cold Water Rough In
- Plumbing Installation Of Suspended Sanitary Waste
- Pole Pruner - Telescopic
- Polyethlyene Pipe Butt Welding
- Pool Chemicals Safe Handling
- Pool Construction - in ground
- Pool Construction- above ground
- Post Driver
- Post Hole Digger
- Postformer
- Powder Coat
- Power Tools
- Pressure Cleaner - Electric
- Pressure Cleaning - Using Steam
- Q-Fever Policy
- Quad Bike - Operation
- Refridgeration Gases
- Remote Area Four Wheel Driving
- Remote Work - Overseas and Remote areas
- Removalist
- Replacing Tyres And Rims
- Retaining Walls- Block
- Ride On Drum Roller
- Rigging Safety
- Rip Saw
- Road Works - Site Preparation
- Rock Saw
- Roof Tiling
- Roofing - Zincalume/Colorbond
- Roofs - Safe Working on Roofs
- Router
- Rubbish Removal
- Safety Harness
- Sandblasting
- Sander - Horizontal and Vertical
- Scaffolding
- Scissor Lift
- Scraper Operation
- Sealing of Exposed Headings
- Security Patrol and Lock Up
- Security System Installation
- Servicing Engines
- Sewing Machine (Industrial)
- Sharps Disposal
- Sheet Metal Roller
- Shipping Container - Unloading
- Shower Screen Installation
- Site Maintenance Truck
- Skip Bins - Loading & Unloading
- Solar Hot Water Installation
- Spindle Moulder
- Spotters
- Spray Painting Outdoors
- Spray Painting- booth
- Stairs Handrails & Balusters
- Staple Gun
- Steel Construction
- Stone Bench Top Installation
- Stone Cladding
- Storm Water Drains Vacuumation
- Street Sweeper
- Stump Grinder
- Synthetic Mineral Fibres
- Table Planer
- Table Saw
- Thicknesser
- Tiling - Wall & Floor
- Tilt Tray Truck - Safe Loading & Unloading
- Tilt-Up Pre-Cast Concrete Panels
- Timber Floor Sanding & Polishing
- Timber Framework
- Tipping Trucks
- Tower Crane
- Tractor Operation
- Tractor Slashing
- Tractor Slashing - Roadside
- Traffic Management Plan
- Transport of Pre Fabricated House and Buildings
- Treated Pine
- Tree Felling
- Tree Felling using Dozer
- Trench Collapse
- Trench Work
- Trestle
- Trucks - Safe Loading and Unloading
- Tying Rebar
- Underground Cable Locating - Sub Soil
- Vehicle Accident
- Vinyl Flooring - laying
- Vinyl Tiles - Laying
- Wacker Packer
- Walk Behind Trencher
- Water - Working Over and Adjacent to
- Water Truck
- Waterproofing Wet Areas
- Weed Control
- Welding- Mig/Maw
- Welding- Oxyacetylene
- Welding- Spot
- Welding- Stick
- Welding- Tig
- Wide Belt Sander
- Winch Safety
- Window Cleaning
- Window Cleaning - Pole Detergent
- Window Installation
- Wood Chipper
- Work Station Ergonomics
- Work Undertaken in Private Residences
- Working Around Plant or Machinery on a Construction Site