Work Method Statements
Trestles Safe Work Procedure
The two page Safe Work Procedure outlines the Safety Steps required when operating a Trestle.
Trestles need to be used with caution and appropriate safety procedures. The Trestle procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

The Procedure includes:
- Risk Assessment
- Planning & Pre-Start Checks
- Preparation
- Ascending & Descending
Trestles Safety Notes
When Operating a Trestle:
- Make sure the sole of your shoes are free or slippery items such as mud.
- Always face the Trestle when ascending or descending.
- Tresltes should be used in matched pairs. (The rungs the same height).
- Trestles must only be used for the designed purpose.
- It needs to be regularly inspected and maintained
