Work Method Statements
Tree Felling Safe Work Procedure or Work Method Statement
The ten page Safe Work Procedure outlines the Safety Steps required when Tree Felling.
Tree Felling need to be used with caution and appropiate safety procedures. The Tree Felling procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

The Procedure includes:
- Risk Assessment
- Chainsaws
- Climbing Trees
- Ladders
- EWP's
- Using Tools in Trees
- Felling Trees
- Waste Removal
- Emergencies
Tree Felling Safety Notes
Before Tree Felling:
- A tree climber must be attached to the tree.
- A ground worker must be in attendance.
- Ladders must conform to the applicable provisions of AS 1892.
- Equipment should be attached so no damage will be caused to the rope.
- Timber under tention must be considered hazardous.
