Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Stump Grinder Safe Work Procedure or Work Method Statement

The seven page Safe Work Procedure outlines the Safety Steps required to operate Stump Grinders Safely.

Stump Grinders need to be used with caution and appropiate safety procedures. The Stump Grinder procedure is ready to use and is not a blank template. Safety Procedures can be edited or customised in MS Word if required.

SWMS Sample


The Procedure includes:

  • Risk Assessment
  • Being Prepared
  • Pre-start Checks
  • Operating
  • Completion
  • Transporting
  • Emergencies

Back  Buy Now $79.95 plus GST

Stump Grinder Safety Notes

Before Operating Stump Grinders:

  • Review all safety decals.
  • Confirm all the guards are in place in good condition.
  • Make sure the engine is stopped before refueling.
  • If there is a leak in the fuel system the engine must not be started until resolved.
  • The break is in lock position.

Back  Buy Now $79.95 plus GST