Work Method Statements
Sheet Metal Roller Work Method Statement or Safe Work Procedure
$79.95 plus GSTSheet Metal Roller Safe Work Method Statement:
The Sheet Metal Roller Safe Work Method Statement (SWMS) is a comprehensive 5 page procedure outlining the safety steps for using a Sheet Metal Roller.
The Sheet Metal Roller procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.
It is then ready for printing and to be incorporated as part of your overall OHS System. The Sheet Metal Roller procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
Sheet Metal Roller Safe Work Method Statement includes:
- PPE
- Safety Notes
- Planning
- Pre- operational checks
- Operation
- Clean up & maintenance
- Emergency procedure
- References
- 5 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
Clean up & maintenance :
- Switch off the machine and remove power supply (isolate from power).
- Clean work area (Use gloves to handle scrap).
Note : Sheet metal edges are sharp.
- Inspect for damage. If damaged, tag out plant and report immediately.
- Follow manufacturer’s instructions for regular maintenance and servicing.
- Ensure any guards removed during maintenance are replaced and secured.
References
OHS Legislation in all States
National Standard for Plant [NOHSC:1010(1994)]
Worksafe Victoria - Code of Practice for Plant
DEIR Queensland – Product Manufacturing Industry – Sheet Metal/Plate Rolling Machines, 2003
Worksafe Victoria – A Guide to Safety in the Metal Fabrication Industry 2007.
Australian Standards 4024-1998 Series – Safeguarding of Machinery