Work Method Statements
Security System Installation Work Method Statement
The Security System Installation Safe Work Method Statement (SWMS) is a comprehensive 14 page procedure. This SWMS covers risks associated with general installation of security systems. Ensure the manufacturer's installation manual/guide is available for specific type of system, CCTV, lighting, etc and information for associated installation works.
The Security System Installation Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Security System Installation Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Security System Installation includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Pre-operational Inspection
- Operation
- Maintenance
- Emergency Procedures
- References
Product Details:
- 14 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Related Products:
Preparation:
Ensure suitable equipment for job. Examples:
-
Work at heights:
- Ensure scissor lift or step platforms are used. If ladders are only option, ensure they are industrial, good condition, set-up correctly and secured both top and bottom.
- Where a roof pitch exceeds 35 degrees, do not stand on the roof. Work from a cherry picker, scaffold or travel restraint system.
- If using travel restraint or fall arrestors, ensure the harness and clips are compatible, anchor points have been assessed by qualified persons, training undertaken and emergency plan in place for rescue.
-
Manual handling
- Use hand trucks, cable trolleys to move materials
- Use mechanical aids to lift and hold materials in position
- Lifting equipment has suitable SWL.
- Use smaller sized cable drums
-
Power Tools:
- Guards in place
- Electrical leads in good condition and tested/tagged, RCDs in use
- Correct for job/used for purpose
-
Hazardous Materials
-
If cutting/drilling into structures, determine material type. Provide suitable personal protective equipment for short term works – example:
- Non-Friable Asbestos: Protective clothing, P1 or P2 half face (can be either disposable or cartridge)
- Silica: P1 or 2 half face with particle cartridge
-
If cutting/drilling into structures, determine material type. Provide suitable personal protective equipment for short term works – example:
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.