Work Method Statements
WA Construction Site Safety Management Plan SSMP
The West Australian Construction Site Safety Management Plan (SSMP) has been developed in compliance with the WA Government Guidelines for Site Specifc Management Plans.The West Australian Construction Site Safety Management Plan (SSMP) has been developed in compliance with the WA Government Guidelines for Site Specifc Management Plans.
It is a comprehensive 35 page OHS Site Management Plan that is suitable for Principal Contractors and Subcontractors. This is a ready to use Site Plan and not a blank template that can be easily edited in Microsoft Word.
Simply enter your Company Name and details, sign, date and add the site specific details. The plan is then ready to be printed and used on site.
- 35 pages + plus an additional 24 pages of OHS tools and forms
- Microsoft Word Format
- Easy to edit and implement
- Simply sign, date and add the site specific detail
The WA Construction Site Safety Management Plan SSMP includes:
- Project details
- Emergency Procedures
- Site Hazard Profile
- OHS Policy
- Alcohol and drugs policy
- Equal opportunity, bullying and unlawful harrassment policy
- Non smoking policy
- Communications Statement
- Return to Work Program
- Hazard identification, risk assessment and control
- Plant and equipment
- Electrical safety
- Hazardous substances
- Manual handling
- Hearing protection
- Personal Protective equipment (PPE)
- Worksite inspections
- Purchasing and delivery of goods and services
- Traffic control
- Statement of responsibilities
- OHS training and competency
- Injury management
- Site safety rules
- Subcontractor management
Tools and forms include:
- Toolbox meeting minutes
- Hazard report form
- Hazard profile
- Workplace inspection checklists and corrective actions
- Plant and equipment register
- Plant and equipment checklist
- Electrical equipment register
- Hazardous substances/ Dangerous goods register
- PPE register
- Site induction register
- Employee Training and competency record
- Incident/ near miss/ hazard report register
Supplied in MSWord format the Site Safety Plan is email ready and is available for Instant Download.