Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

SA Construction Site Safety Management Plan SSMP

$895 + GST Buy Now

The South Australian Construction Site Safety Management Plan (SSMP) has been developed in compliance with the SA Government Guidelines for Site Specific Management Plans.

This comprehensive 35 page OHS Site Management Plan is a full working Site Plan that can be easily implemented and is suitable for both Principal Contractors and Subcontractors.

This is a ready to use Safety Plan and not a blank template. The Site Plan is easily edited in Microsoft Word, simply enter your company name and details, sign, date and add the site specific details. The plan is ready for printing and to be used on site.

  • 35 pages + plus an additional 24 pages of OHS tools and forms
  • Microsoft Word Format
  • Easy to edit and implement
  • Simply sign, date and add the site specific detail

The SA Construction Site Safety Management Plan SSMP includes:

  • Project details
  • Emergency Procedures
  • Site Hazard Profile
  • OHS Policy
  • Alcohol and drugs policy
  • Equal opportunity, bullying and unlawful harrassment policy
  • Non smoking policy
  • Communications Statement
  • Return to Work Program
  • Hazard identification, risk assessment and control
  • Plant and equipment
  • Electrical safety
  • Hazardous substances
  • Manual handling
  • Hearing protection
  • Personal Protective equipment (PPE)
  • Worksite inspections
  • Purchasing and delivery of goods and services
  • Traffic control
  • Statement of responsibilities
  • OHS training and competency
  • Injury management
  • Site safety rules
  • Subcontractor management

Tools and forms include:

  • Toolbox meeting minutes
  • Hazard report form
  • Hazard profile
  • Workplace inspection checklists and corrective actions
  • Plant and equipment register
  • Plant and equipment checklist
  • Electrical equipment register
  • Hazardous substances/ Dangerous goods register
  • PPE register
  • Site induction register
  • Employee Training and competency record
  • Incident/ near miss/ hazard report register

Supplied in MSWord format the Site Safety Plan is email ready and is available for Instant Download.