Work Method Statements
Retaining Walls- Block Work Method Statement
The Retaining Walls- Block Safe Work Method Statement (SWMS) is a comprehensive 13 page procedure. This SWMS covers general safety aspects associated with building block style retaining walls.
The Retaining Walls- Block procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Retaining Walls- Block Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Pre-operational Inspection
- Operation
- Maintenance
- Emergency Procedures
- References
Product Details:
- 13 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Planning
Contact Dial before you Dig and Local Authorities. Obtain utilities maps of intended work area if required.
Ensure equipment suitable for task – (know the limitations of equipment –gradients, type of soil/compaction, SWL)
Ensure communication equipment available (check for mobile phone service in remote areas).
Ensure power tools suitable for task:
- Suited to the material/soil type
- Not too powerful for task. Eg: don't use larger angle grinder than needed. Sufficient power for task – no excessive force
Ensure:
- Rings, bracelets, watches etc are removed.
- Long hair is tied back
- No loose clothing or loose gloves are worn
Inspect intended work area. Check:
- Underground services/utilities (Dial before you dig)
- Type of soil (wet, dry, compact etc)
- Rocks, tree roots etc.
- Weather conditions, lighting
- Cliffs, pits, drop-offs, newly excavated soil, trenches
- Sufficient room so operator will not be knocked or need to over-reach
- Area clear of debris, cut-offs etc
- Work pieces are able to be secured and stable
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.