Work Method Statements
Pressure Cleaner - Electric Work Method Statement
Electric High Pressure Water Cleaners can be extremely dangerous and this two page Safe Work Procedure or Work Method Statement is a vital part of a safe work system.
This Is Not A Blank Template and are not blank templates.
Safety Procedures can be edited or customised in MS Word if required.
The Pressure Cleaning Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Safety Procedure includes:
- Personal Protective Equipment
- Pre Planning
- Operating
- Water Pressure
- Electric Shock
- Trips and Falls
- Completion
- Risk Ratings
Product Details:
- 2 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
- Instant download delivery
Pressure Cleaner Safety Notes
Before Using Pressure Cleaners - Ensure:
- Position the cleaner as close as possible to the water supply.
- Connect the electric lead to a safety switch.
- Ensure that the electric lead will be away from the area to be cleaned.
- Connect the water hose and check that it is secure.
- Connect the high pressure hose and gun.
- Check the operation of the gun safety switch and trigger.
- Check the distance that can be covered before the cleaner will need repositioning.
When Using A Pressure Cleaner
- Operate the gun safety switch and trigger so that water runs out of the nozzle.
- Direct the water away from the cleaner and turn on the power switch.
- Direct spray onto the work area.
- Remember that the pressure can be reduced by simply moving the nozzle further away from the work.
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.