Work Method Statements
Pole Pruner - Telescopic Work Method Statement
The Pole Pruner - Telescopic Safe Work Method Statement (SWMS) is a comprehensive 12 page procedure. This SWMS concerns the use of a petrol operated telescopic pole pruner with a power saw-head attachment.
The Pole Pruner - Telescopic procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Pole Pruner - Telescopic Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Pre-operational Inspection
- Operation
- Maintenance
- Emergency Procedures
- References
Product Details:
- 12 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Planning
- Check for pits, gradients, uneven terrain
- Check for overhead power-lines in close proximity
- Clear stones, sticks, glass or other solid objects (tripping hazards) from area
- Note: Do not work in No Go Zones of electrical power-lines unless de-energised/isolated and evidence of the continuing isolation of the power supply is obtained.
- Ensure tool remains at least 15m clear of power-lines at all times.
- Note: Electricity can jump from one point to another and /or be conducted through damp branches.
- Ensure pruner is suitable for task.
- Consider task requirements and duration.
Note: Do not work in No Go Zones of electrical power-lines unless de-energised/isolated and evidence of the continuing isolation of the power supply is obtained.
Ensure tool remains at least 15m clear of power-lines at all times.
Note: Electricity can jump from one point to another and /or be conducted through damp branches.
Ensure pruner is suitable for task.
Consider task requirements and duration.
Example:
- Sufficient motor capacity
- Sufficient length/height
- Cutting capacity
- Backpack style harness for longer duration tasks
- Lightweight units with pivoting head that can lock into place
The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.