Home | WMS Format | WMS Purpose | Contact Us | CALL US 1300 306 604

Plant Roll Over Work Method Statement

SWP_Sample

Back   Buy Now $79.95 ex GST

The Plant Roll Over Safe Work Method Statement (SWMS) is a comprehensive 7 page procedure outlining the safety steps for general emergency procedures in the event of plant/machinery roll-over.

All precautions must be taken to ensure that plant roll-over will not occur. Ensure all equipment provided with ROPs, seatbelts are worn, plant is provided with emergency exits in cabin and assessments are undertaken of work area/type of ground and gradient.

The Plant Roll Over Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Emergency Response- Plant Roll Over Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Pre-operational inspection
  • Operation
  • Maintenance
  • Post-rescue procedures

Product Details:

  • 7 page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Post Rescue Procedures

When safe to do so, contact relevant Occupational Health and Safety Authority and await instructions from Inspector (eg: leave site undisturbed).

Co-operate with relevant investigatory authorities (police, fire department, OHS Inspectors, Coroner or Coroner Representatives etc).

Cease work, review SWMS and conduct thorough incident investigation before recommencing any works.

An engineer (or other suitably qualified person must verify that plant is in safe condition before it is used again).

Review emergency response procedures and amend accordingly.

Provide post-traumatic incident follow-up with victims, witnesses and offer counselling/support as required.

Back   Buy Now $79.95 ex GST

The Work Method Statement is in MSWord Format for unlimited printing and use and will be emailed directly to you.